Regional Hospital Tower Expansion
Healthcare$200M

Regional Hospital Tower Expansion

WisconsinConfidential250,000 SF
Scan to BIM4D SchedulingBIM Coordination3D ModelingVDC ConsultingUnderground Modeling
Regional Hospital Tower Expansion
Regional Hospital Tower Expansion 2
The Challenge

A 10-story hospital tower addition in an active, operational hospital campus demanded that VDC coordination minimize any disruption to patient care. Laser scanning of the existing structure was critical and the complex MEP systems for patient rooms zero-tolerance coordination.

Our Approach

The team used laser scanning and Scan-to-BIM to establish an as-built Revit base model. The federated model brought structural and MEP systems together for coordination. A Synchro 4D model supported review of construction phases around occupied hospital zones.

Outcome

The documented scope comprised an as-built Revit model, federated MEP coordination and a 4D phasing review. Scanner model, scan totals and resolved-clash counts are omitted until the project records can establish a consistent basis.

Key Highlights
Laser-scan registration and as-built base modeling
Phasing review for a 10-story addition to an occupied hospital
Pre-construction review of structural and MEP interfaces
4D phasing model for owner and subcontractor planning
Operating room and ICU MEP coordination to medical-grade tolerances
Project Details
Value
$200M
Size
250,000 SF
Sector
Healthcare
Location
Wisconsin
VDC Services
Scan to BIM
4D Scheduling
BIM Coordination
3D Modeling
VDC Consulting
Underground Modeling

Similar project?

Tell us about your project we respond within one business day.

Request a Quote
Same sector

Related Projects

Regional Hospital Tower Expansion: VDC Case Study | EZ-VDC