
Regional Hospital Tower Expansion


A 10-story hospital tower addition in an active, operational hospital campus demanded that VDC coordination minimize any disruption to patient care. Laser scanning of the existing structure was critical and the complex MEP systems for patient rooms zero-tolerance coordination.
The team used laser scanning and Scan-to-BIM to establish an as-built Revit base model. The federated model brought structural and MEP systems together for coordination. A Synchro 4D model supported review of construction phases around occupied hospital zones.
The documented scope comprised an as-built Revit model, federated MEP coordination and a 4D phasing review. Scanner model, scan totals and resolved-clash counts are omitted until the project records can establish a consistent basis.
Applications by industry, team and location
- BIM Coordination for Healthcare Construction
- Scan to BIM for Renovation and Historic Preservation
- VDC Consulting for General Contractors
- 4D Scheduling for Healthcare Construction
- Scan to BIM for Hospitals & Healthcare Facilities
- VDC Consulting in Lima, Peru | BIM Execution Plans
- BIM Coordination Services in Peru | MEP Clash Detection
- Scan to BIM Services in Lima, Peru | Laser Scanning


