BIM coordination & VDC for construction teams.
BIM and MEP coordination, clash detection, 4D scheduling, and Scan to BIM for contractors and owners. Senior VDC engineers supporting U.S. teams remotely and projects in Peru.
Where MEP density is highest
Hospitals, laboratories, and pharmaceutical campuses, the building types where coordination failures cost the most.
Engineering plus software
Published Autodesk plug-ins built from real coordination workflows.
Bilingual delivery
Direct technical communication for US and Latin American teams.
The disciplines that reduce execution risk.
Three questions decide whether a complex build stays on schedule: what gets installed, when it gets installed, and what is already there. We answer all three from one federated model.
01BIM / MEP Coordination
Federated model review, clash prioritization, issue ownership, and weekly resolution across every trade.
View service
024D Scheduling
Schedule-linked models that expose phasing, logistics, and trade-stacking risks before construction.
View service
03Scan to BIM
Registered point clouds converted into verified as-built models for renovation and tie-in coordination.
View service
Mixed-Use Student Housing Tower
Experience is demonstrated through outcomes.
Led VDC planning and site logistics for a 15-story mixed-use student housing tower with 6 below-grade parking levels in downtown Madison, WI. The urban site required complex sequencing to manage tower crane operations, material staging, and adjacent street impacts simultaneously. Delivered a full 4D construction simulation linking the Revit model to the project schedule to expose phasing conflicts before they hit the field. MEP coordination and underground utility modeling were executed across all trade disciplines from preconstruction through construction documents.
Direct technical ownership from kickoff to closeout.
Define
Align scope, deliverables, model standards, and the coordination cadence.
Coordinate
Federate models, prioritize conflicts, and drive resolution with every discipline.
Verify
Document decisions, validate closeout, and hand over an auditable record.
Let’s review your project’s coordination risk.
Share the project type, phase, and scope. We respond within one business day.
Discuss a Project