
Shop Drawing & As-Built Drawing Services
Shop drawing production for fabrication and installation. Define systems, sheet lists, review rounds and as-built documentation.
We prepare shop drawing packages from agreed model and design inputs for defined fabrication and installation uses. The scope identifies systems, sheet lists, required details, submittal support and review rounds. As-built drawing updates can be included when the source of field information and verification responsibilities are defined.
Model Receipt & Verification
We verify that the source BIM model has been fully coordinated before shop drawing production begins, flagging any open clashes that would impact fabrication dimensions.
Drawing Production
Shop drawings are generated from the coordinated Revit model and dimensioned to fabrication tolerances, with all required annotations, details, and reference callouts included.
Internal Review & QA
A discipline-specific checklist review ensures drawing completeness, dimension accuracy, and compliance with project submittal requirements before first submission.
Submittal & Revision Management
We manage the full submittal cycle in Procore or ACC, tracking review comments, coordinating clarifications with the design team, and issuing revised packages on schedule.
As-Built Update
Field-verified changes are incorporated back into the model and documentation, maintaining a current as-built record through the full construction and commissioning period.
Define your fabrication and installation drawing package
Shop drawings communicate the agreed fabrication or installation information. Specify the systems, drawing list and review roles before production starts.
- Coordinated source models and current design information.
- Systems, zones, sheet list, scales and required details.
- Fabrication or installation requirements supplied by the responsible parties.
- Review and submittal process, revision rounds and issue dates.
How we define cost, timing, and deliverables
We define model preparation, drawing production, submittal support and as-built updates separately. Effort depends on system complexity, sheet count and revisions. Release for fabrication or construction follows the project review and approval process.
Scope my shop drawing packageGuides for planning your project
Are shop drawings the same as construction documents?
They serve different purposes. Shop drawings address defined fabrication or installation information; general construction documentation communicates the agreed design package. Specify the exact sheet list and review responsibilities.
Who approves the drawings for use?
Approval follows the project's assigned review and release process. We define submittal support and revision responsibilities in the scope.
Can you prepare as-built drawings?
Yes, with agreed source information and verification responsibilities. Identify field markups, surveys or models to be used and how unresolved conditions will be recorded.
Editable worksheets for scoping the work
Blank Markdown templates: open them in any text editor. They contain no client data and do not represent project results.
How to compare proposals

